Plus: Lithium-ion battery hazards on construction sites
If you are having trouble reading this email, read the online version.
 
FIRE BRIEFING 29.06.2023
 
Anxiety, mistrust and anger: The resident’s view of the Building Safety Crisis

A heartfelt view from two homeowners who have become involved in the wider campaign on fire safety remediation was given at FIREX 2023 in May.


 
The hazards of Lithium-ion batteries on construction sites
Speaking at the High Rise Construction Fire Safety Conference held alongside FIREX in London last month, Matthew Pearce and Andy Lack from Skanska outlined the hazards of Lithium-ion batteries on construction sites.

 
‘Largest wireless fire detection installation of its kind’ protects 37 high-rise residences in Solihull
Said to be one of the ‘largest wireless fire installations to date’, Early Birds Fire Protection has specified Kentec’s K-Mesh system across 37 high-rise towers and 2,000 apartments in Solihull, near Birmingham.

 
 
Download the 2023 media pack to start promoting your products and services with IFSEC Insider.
If you would prefer to no longer receive the IFSEC Insider Fire Briefing, please click here.

Alternatively, to contact our data services team to have your details updated or removed entirely from our database please email imdatateam@informa.com

This email was sent to you by the Informa Markets division of Informa PLC. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG.
Registered in England and Wales. Number 3099067.