| | | Liu Shiwen Ends 10-Year Wait for Women's Singles Gold at #ITTFWorlds2019
Liu Shiwen has struck Gold at the 6th time of asking in a sensational showdown with Chen Meng!
“Ever since I became Women’s World Cup Champion at the age of 19, I have always dreamt of winning the World Championships. Since then, I missed out on the opportunity by losing two finals. I found myself doubting my ability to succeed and I even considered giving up. Therefore, I am very grateful to all those who have been supporting me all this while and my team for giving me this chance to win today. I think that I deserve this trophy, even if it has taken time.” - Liu Shiwen (CHN) |
|
|
| | #LiebherrLive Day 7 Review | Epic Finals, Semi-Finals & Major Trophies
Day 7 at #ITTFWorlds2019 saw yet more silverware lifted with the Men’s Doubles and Women’s Singles finals taking place. |
|
| STIGA Point of Day 7
Relentless counter shot by Ma Long to earn the STIGA Point of Day 7! |
|
| #TATATrickshots | Manika Batra Trickshot Time!
Manika Batra taking on the #TATATrickshot challenge at the #ITTFWorlds2019! 🔥🔥 |
|
| The Day of Liu Shiwen 🏆
10 years, 6 attempts, 3 finals, 1 GOLD! Relive the golden day of 2019 Women's Singles World Champion Liu Shiwen 🇨🇳! |
|
| Ma Long & Wang Chuqin Success on Doubles Debut
Ma Long the Dictator leads Wang Chuqin to Men's Doubles Gold on their first doubles outing in Budapest! |
|
|
| | 5 Things we learnt from Day 7 in Budapest!
Day 7 at #ITTFWorlds2019 was exhilarating from start to finish with 2 gold medal contests and more history being made! |
|
| Preview Day 8 | Crunch Time in Budapest, Destiny Awaits
Look ahead to the big matches taking place on Sunday at the #ITTFWorlds2019! |
|
| Swede Swede Victory for Mattias Falck
Mattias Falck secured his place in the Men's Singles final after a thrilling 7-game match against An Jaehyun. Hear what the players have to say about their first ever World Championships semi-final appearance! |
|
|
|
|
| |
|